Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka

Batroun & Chekka, Lebanon

Project Type(s):  Roads & Bridges

Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka - Image 1
Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka - Image 2
Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka - Image 3
Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka thumbnail 1
Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka thumbnail 2
Tabarja-Tripoli Highway, Lot 3, Batroun-Chekka thumbnail 3

Construction of 13 km of two-way motorways, comprising 2 tube tunnels each 400 m long. Works included: 1,800,000 m³ of earthwork (1,400,000 m³ of rock), fly-overs, overpasses, box culvers, drainage system, sub-base, base course, gravel and cement base, bituminous concrete. Concrete structures and walls 75,000 m³.

Status: Completed 1986

Employer:

Conseil Exécutif des Grands Projets (C.E.G.P.)