A.R Hourie logo
Projects

Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar

Jbeil, Lebanon

Project Type(s):  Roads & Bridges

Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar - Image 1
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar - Image 2
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar - Image 3
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar - Image 4
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar thumbnail 1
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar thumbnail 2
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar thumbnail 3
Tabarja-Tripoli Highway, Lot 1A, Bridges on Nahr Ibrahim & Nahr El-Fidar thumbnail 4

Construction of two bridges: Nahr Ibrahim bridge has 3 spans (26 m, 40 m and 30 m with 2x14 m pre-stressed concrete), 20 m diaphragm walls for foundations in the river, and foundations on barrettes cast under bentonite 20 m deep. Nahr El-Fidar bridge has 2 arches 97 m long, 2 decks 132 m long & 14 m wide; its height is 35 m. Works included injection of mortar for foundations.

Status: Completed 1978

Employer:

Conseil Exécutif des Grands Projets (C.E.G.P.)