.17801cfa.webp&w=3840&q=75)
Works included: 300 m of sea wall concrete foundation up to depths of 6 meters built with reinforced concrete caissons filled with concrete, 30 m span bridge over the sea, sea fills, road construction, drainage, side walls paving and asphalting.
Status: Completed 1981
Employer:
Conseil Exécutif des Grands Projets de la Ville de Beyrouth (C.E.G.P.V.B.)
Consultants:
ETEC Consulting Engineers (Etudes Techniques et Economiques)